SYNERGYS PROJECT: Complex Engineering for Deep EGS Drilling

Univerzita Karlova

This public contract is for specialised services in relation to the implementation of the phase 1 of the drilling and EGS reservoir testing (as described in detail in Part 2 of the Tender Documentation) that includes drilling of the deep GT-1 well and execution of series of stimulation tests in the depth of 3.0-3.5 km for determination of the future EGS reservoir development. For more details, please refer to the tender documents.

Termín
Lhůta pro podání nabídek byla 2025-09-09. Veřejná zakázka byla zveřejněna na 2025-08-07.

Kdo?

Cože?

Historie zadávání veřejných zakázek
Datum Dokument
Související vyhledávání 🔍